This writing aims to respond to the proposal requested by C & H Law, LLC, based at 111 East First Street Wise, Va 24283. The projectseeks a bid to complete the company’s information technology (IT) solution for its law offices located in Wise and Big Stone Gap, Virginia. The company has been operating manually, relying on traditional “paper-full.” Now, it is seeking to go paperless. The company would like to source for services for installing and maintaining a local area network (LAN) in each of its two locations and an extensive area network (WAN) that links its two offices. Hence, this response is a request for a bid to implement the company requests.
Scope
After reviewing your proposal, we have come up with the following suggestions that are suitable for your firm. The objective is to design the LAN for each of your two locations and WAN links that facilitate intercommunication for the two offices. We have included suitable physical and logical designs as well as specifications for the proposed network illustrated in the diagrams below. At the same time, maintenance provisions are made to strengthen network security. In this case, we believe that once the implementation is completed, the company will have achieved its objective of having modernized technological resources. The network system will provide essential and many required benefits to improve the company’s communication and document security besides offering a high-speed type of connection.
Physical Design
Figure 1 shows the physical topology diagram demonstrating the implementation direction for the proposed project. The figure also illustrates the main network points like locations, system devices, and the areas for cable installation.
Figure 1: Physical Network Design (LAN) for the two offices
Within the physical design, we offer the following features;
Logical Designs
A CISCO,a safe structure, will be designed to help meet the company’s technical and business goals. The objective is to enable best practices regarding the design and implementation of secured network facilities. The logical design has three main sections as described below;
All these functional areas have network modules that can include the distribution, the core, and the access layers functionality.
Figure 2: Logical Network Design for both offices (LAN and WAN)
Scheduling
Once the bid is approved, our organization anticipates starting implementing the project from 11th May 2020 for one month, that is, 30 working days.
Pricing
The following is a cost breakdown for implementing the network;
Table 1: Proposed Network Design and Implementation Budget
Category | Costs of Network Infrastructure |
Cooling Equipment | $ 10,820 |
Power Equipment | $ 9,800 |
Service | $ 12, 567 |
Project Management | $ 2,500 |
System Monitoring | $ 1,780 |
Racks and Enclosures | $ 6,000 |
Space used for the network | $ 54,900 |
Power | $ 80,800 |
Total | $ 186,187 |
Terms of payment
Our terms of payment are as follows;
Payment Requirements
We want to brief also on our payment requirement for continued maintenance and provision of network services once systems are implemented. This includes sustaining LAN and WAN services. The following table contains these descriptions.
Option | Technology | Speed | Monthly Prices |
A | Leased lines: T1 at Big Stone Gap and T3 into main offices at Wise, Virginia | T3 or T1 | $200 for T1, $3000 for T3 |
B | High-speed business cables at Wise and Big Stone Gap, Virginia | 8 Mpbs downstream,780 Kbps upstream | $120 |
T3 Internet at Main Offices, Wise, Virginia | T3 | $2,500 | |
C | MPLS VPN: T1 access at Big Stone Gap, Virginia | T3 or T1 | $ 600 for T1 access |
T3 access at the main office building, Wise, Virginia | $ 7400 for T3 access | ||
D | Frame relay: T1 access at Big Stone Gap, Virginia | T3 or T1 | $ 400 for T1 access |
T3 access at the main office building, Wise, Virginia | $ 7400 T3 access and circuit plus a CIR in a 5-MBPS increment. |
As shown in the table, the company is ready to offer any of your preferred options. Our payment requirement will be implemented through a hosted payment system. Such a system is the most suitable for your firm as it cannot interfere with sensitive information that may be in your firm.
Other Information
Besides, we would like to show you that we have implemented similar projects for several companies within the city. Some of the companies include Kearny Public Library, Kings Highway Chiropractic, and LIVunLTD. All these projects have been successful.